02 / THE CHALLENGE
Higher quotations and longer lead times.
A Germany-based customer needed 30 RTC6705A components for a drone module development project. Other sourcing channels had quoted higher prices and longer lead times. The customer needed a more competitive option for this small-quantity purchase.
The customer was arranging PCB/PCBA manufacturing work in China. The components were intended for its designated manufacturing service provider there, rather than shipment to Germany.
03 / OUR SOURCING SOLUTION
Source in China. Dispatch to the designated provider.
Review the purchase requirement
The requirement was 30 RTC6705A components for the customer’s drone module project, with a delivery destination in China.
Find available domestic stock
RuiReach searched domestic supply channels in China, identified available stock and provided a quotation below the other offers the customer had received.
Coordinate dispatch after confirmation
After order confirmation, RuiReach arranged dispatch to the customer-designated JLCPCB manufacturing service provider in China. Dispatch took place on the same day as order confirmation.
JLCPCB was selected by the customer. Its name identifies the shipment destination; it does not imply an official partnership, endorsement or authorization. Same-day dispatch does not mean same-day arrival.
04 / THE OUTCOME
30 components sourced. Dispatch completed that day.
- 30 RTC6705A components sourced for a German drone hardware project.
- A quotation below the other offers received by the customer.
- Same-day dispatch following order confirmation.
- Shipment coordinated to the customer’s designated manufacturing service provider in China.
This order illustrates small-quantity electronic component sourcing and domestic shipment coordination for an international hardware team manufacturing in China. Availability, pricing and dispatch timing for other requirements must be confirmed separately.
Customer identity is withheld. RuiReach retains purchasing and dispatch records for this order; those documents are not reproduced on this page. No delivery transit time, measured saving or technical validation outcome is claimed.
